Today I riveted the forward portion of the left canopy deck in place. I then started work of the righ side deck/rail. As with the left side, I drilled the last of the mounting holes for the canopy channel, made a spacer and installed the nutplates. I did not rivet the righ side on yet. The 106 degree heat in the shop got to be to much for me in the afternoon.