Today I finished work on the left canopy deck/rail. I finished drilling the roller channel for the canopy to the rail and to the gusset at F-605. I removed the rail and installed nutplates. I also fabbed a 0.125 spacer to go on top of the F-605 gusset and under the canopy rail. I then riveted the rail in place.