Brief Description: Wire Bracket for Pitot Heat Controller
I cleco'd in the pitot tube to look at how to route the wires to the controller. Tried a few different wire paths but best seemed a bracket with adel clamp on the rib with the controller. Made up an angle bracket and drilled it for mounting holes and nutplate. Deburred all holes and match drilled to rib.
Started to plan the run for the tubing from static ports to ADAHRS. Cut a couple of short practice pieces and experimented with several options I saw on other builder logs. Picked up some 1/4 inch nylon tube clamps at the aviation department in the local Ace. These look like they will work well to secure the tubing.