KitLog pro

Powered By Kitlog Pro v2.0

Carl Bells RV7A N947CB
' style=
Date:  4-17-2009
Number of Hours:  4.00
Manual Reference:  AeroElectric Z11 P
Brief Description:  Wiring up the Main and Endurance Bus

The 6 gauge wire and terminals for the main bus came in today from B & C and I didn’t have a clue how to swage the terminals in place. I called Ray Sheffield and he had a huge nico-press type crimper that handles 4-10 gauge swages. He needed to fly today anyway and decided to fly over from Twin Lakes for lunch. The net is, it did a great job and we could not pull the terminal off a test piece even with the wire in the vice and pulling it with vice grips. I put heat shrink on the terminal after we did the swage. I also mounted the endurance bus diode to a heat sink as required for a 10 Amp endurance bus and mounted it to the sub-panel. I just try to get something wired every day and hopefully one day in my lifetime all the wiring will be done.
' style=

6 Gauge wire to the main bus

6 Gauge wire to the main bus

' style=

Shown connected to the main bus, note the big wire and terminal on top

Shown connected to the main bus, note the big wire and terminal on top

' style=

Endurance Bus Diode

Endurance Bus Diode

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.