KitLog pro

Powered By Kitlog Pro v2.0

Carl Bells RV7A N947CB
' style=
Date:  5-19-2008
Number of Hours:  2.00
Manual Reference:  Dwg 36A
Brief Description:  Final install of fuel vent lines

Nothing new here just doing the final mount of the tank vent lines, with Locktite on the AN bulkhead fitting nuts. There are platenuts at each Adel clamp and I used large button head SS 8-32 screws to hold them in place. Done!
' style=

In place with 4 Adel clamps

In place with 4 Adel clamps

' style=

The vent pickup

The vent pickup

' style=

To the tank

To the tank

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.