Today I started working of the QB wing. After reading the wing construction section in the manual I got the parts for the aileron horns and flap brace and started to fabricate. This is all pretty straight forward and the parts fit well. The all needed edge finishing and polishing, match drilling and fitting to the wing. I will need to prepare the parts for priming and hit them with the AKZO epoxy before assembly. I hope to get to that early next week if the temperature goes down into the 80's.