KitLog pro

Powered By Kitlog Pro v2.0

Carl Bells RV7A N947CB
' style=
Date:  7-9-2007
Number of Hours:  4.00
Manual Reference:  Dwg 7 & Section 6
Brief Description:  Rolling rudder leading edge and

Rafael helped me to roll the leading edge of the rudder, 4 hands are better then two and I was really frustrated with how much work the right elevator was. This went much better and the wood dowel and doing each section individually is the best way to do it in my opinion. Rafael took pictures and I need to get them fro him to complete this report. The rudder is done except for the riveting of the trailing edge and the fiberglass tip installation. We need to get a 7 degree ground dimple die to finish this and will have one made.
' style=

Clecoed after rolling with a 1

Clecoed after rolling with a 1" dowel

' style=

Pop rivets

Pop rivets

' style=

The big picture

The big picture

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.