Powered By Kitlog Pro v2.0
My RV-8 Build Log
RV-8
Electrical
7-15-2014
< Previous Log Entry
Next Log Entry >
Date:
7-15-2014
Number of Hours:
2.00
Manual Reference:
Brief Description:
Wiring Connections to SCB/CB
• Marked the SCB/CB locations with wire identifiers, and then began connecting the ring connectors to each SCB or CB as indicated in the wiring plan.
• Identified the wires and marked the locations of the ground and power distribution, connected corresponding wires - did not yet secure.
• Pulled all remaining wired of the harness to the wing roots for lighting, and to the boost pump.
• Remaining wiring, there are a few wires to build for the avionics and elevator trim motor...
• In the process of completing the panel install of the G3X stuff and associated do dads.
SCB / CB Connections
So far, so good...
Much Lighting Required for this work
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
876
2687
Ailerons and Flaps
1
5
Avionics
61
194
Baggage Door
1
3
Brake System
17
34
Cabin
7
40
Canopy
44
138
Cowl
56
180
DAR Inspection
1
3
Electrical
97
275
Empennage
97
342
Engine
122
322
Fairings
54
153
First Flight
1
2
Flight Control
17
46
Flight Training
2
10
Fuel System
34
106
Fuselage
98
299
Instrument Panel
17
60
Interior
13
42
Landing Gear
8
18
Lighting
10
26
Markings, Placards a
2
4
Miscellaneous
14
66
None
1
Paint and Prep
8
24
Phase I
1
2
Pitot/AOA
2
6
Post DAR Inspection
3
14
Prop
15
46
QB Kit
2
9
Static Pressure Syst
4
10
Tech Councilor Visit
1
2
Tech Inspection
1
2
Tires
1
1
Transition Training
1
10
Weight and Balance
1
3
Windscreen
27
75
Wings
34
115
Copyright © 2001-2024 Matronics. All Rights Reserved.