Powered By Kitlog Pro v2.0
My RV-8 Build Log
RV-8
All
6-16-2018
< Previous Log Entry
Next Log Entry >
Date:
6-16-2018
Number of Hours:
3.00
Manual Reference:
Brief Description:
New Baggage Door Build Part 2
Continued with the new baggage door build. Strapped the door with ribs to the fuse while clecoed, then final drilled each hole to #40. Removed and disassembled, deburred each hole, then dimpled the skin and ribs as required.
Baggage Door #3 (I think)
New Baggage Door Fitment
Skin Dimpeled
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
876
2687
Ailerons and Flaps
1
5
Avionics
61
194
Baggage Door
1
3
Brake System
17
34
Cabin
7
40
Canopy
44
138
Cowl
56
180
DAR Inspection
1
3
Electrical
97
275
Empennage
97
342
Engine
122
322
Fairings
54
153
First Flight
1
2
Flight Control
17
46
Flight Training
2
10
Fuel System
34
106
Fuselage
98
299
Instrument Panel
17
60
Interior
13
42
Landing Gear
8
18
Lighting
10
26
Markings, Placards a
2
4
Miscellaneous
14
66
None
1
Paint and Prep
8
24
Phase I
1
2
Pitot/AOA
2
6
Post DAR Inspection
3
14
Prop
15
46
QB Kit
2
9
Static Pressure Syst
4
10
Tech Councilor Visit
1
2
Tech Inspection
1
2
Tires
1
1
Transition Training
1
10
Weight and Balance
1
3
Windscreen
27
75
Wings
34
115
Copyright © 2001-2024 Matronics. All Rights Reserved.