KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  6-9-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  GSA 28 Pitch Servo Installation #2

Assembled the GSA 28 Servo, rod end bearings and rod, to the bell crank and bell crank brackets to ensure it all goes together in the airframe.

Removed the old bell crank brackets.

Next is to match drill the old and new brackets keeping the left and right bracket aligned so the bell crank AN4 bolt still passes through without any binding.
' style=

GSA 28 Pitch Servo Test Assemble

GSA 28 Pitch Servo Test Assemble

' style=

Existing Bell Crank Brackets Removed

Existing Bell Crank Brackets Removed

' style=

Old and New Bell Crank Brackets

Old and New Bell Crank Brackets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.