KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  7-13-2014
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Fuel Valve/Filter Re-Install

• Re-Installed Fuel Filter, Valve, Lines, Console cover, Tank Selector cover plate and level. Happy with how it looks - almost professional!
• Started the electrical system install - battery will be forward install since I am using the 180 hp engine, not the heavier 200 hp engine with almost always requires an aft battery install (and associated cables - yuk).
' style=

Re-Installed Fuel Lines, Filter, Valve ...

Re-Installed Fuel Lines, Filter, Valve ...

' style=

Fuel Lever, console cover, plate installed (for now...)

Fuel Lever, console cover, plate installed (for now...)

' style=

Start of the Electrical System - Battery

Start of the Electrical System - Battery

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.