KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  8-15-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Starting the baggage and rear seat floor

Starting the baggage and rear seat floor. Final drill the holes for the blind rivets that will be used for the rear seat floor (later), etc. It's about this time I realize the flap blocks are bolted on top of the rear seat floor. This realization leads to a some weeks of serious concern and frustration, explained later...
' style=

left and right rear seat floor, baggage floor

left and right rear seat floor, baggage floor

' style=

baggage floor, etc.

baggage floor, etc.

' style=

baggage floor, etc.

baggage floor, etc.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.