KitLog pro

Powered By Kitlog Pro v2.0

Bill's Glasair Odyssey
' style=
Date:  4-5-2008
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Inpection Cover Flanges - Foam Core For Standoffs

Layed up 4 ply flanges onto the wing inspection covers. These were done as two separate 2 ply layups. I then cut eight twenty pound foam doughnuts to place over the eight Click Bond stand-off that I had installed the other day. These were bonded in and will be covered by a 2 ply laminate completing a very stiff foam core sandwich hardpoint.
' style=

AP Mount points after 2 ply layup

AP Mount points after 2 ply layup

' style=

Landing gear CB mounts

Landing gear CB mounts

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.