Brief Description: Inpection Cover Flanges - Foam Core For Standoffs
Layed up 4 ply flanges onto the wing inspection covers. These were done as two separate 2 ply layups. I then cut eight twenty pound foam doughnuts to place over the eight Click Bond stand-off that I had installed the other day. These were bonded in and will be covered by a 2 ply laminate completing a very stiff foam core sandwich hardpoint.