This entry covers the last three weeks. Several members attended including Eric S. Eric E., Jay, Derek, Bryan, Pete, Steve, and Hannah
More of the same with prepping the wings. Only real significant addition was the routing of the pitot line from the pitot probe area through the aft wing spar.
pitot tube routing. Will finish off with some elbows before covering and route static line
bracing for rib that will be attached with epoxy to the bottom of the wing tank