Brief Description: applied leading edge to port wing
Art, Jay, and Terry ( 1 hour each) attached the port leading edge per the plans. We used a 3M epoxy, clecos for proper positioning, and tape to apply clamping pressure while the glue cured.
syringes used for measuring epoxy by volume (3:2)
Art applying epoxy to leading edge
Art and Terry applying tape for clamping pressure while clecos hold for positioning