Brief Description: Gear leg priming and hardware assembly
Today I test-fit the wheel/brake hardware onto the right gear leg, similar to the left leg.
Then I removed the brakes and wheels, and prepped and primed the gear legs. After they dried, I reinstalled everything. The gear legs are just about ready to bolt onto the fuselage. I still have to install some AN fittings on the brake housings, and torque and safety a couple of bolts, and they'll be ready to go.