KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  6-11-2009
Number of Hours:  2.25
Manual Reference:  
Brief Description:  Gear leg priming and hardware assembly

Today I test-fit the wheel/brake hardware onto the right gear leg, similar to the left leg.

Then I removed the brakes and wheels, and prepped and primed the gear legs. After they dried, I reinstalled everything. The gear legs are just about ready to bolt onto the fuselage. I still have to install some AN fittings on the brake housings, and torque and safety a couple of bolts, and they'll be ready to go.
' style=

The gear is almost ready to mount!

The gear is almost ready to mount!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.