KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  6-16-2008
Number of Hours:  3.50
Manual Reference:  
Brief Description:  NACA scoop; interior painting prep

I positioned the NACA scoop on the left side of the fuselage, and drilled and clecoed it to the skin. Then I deburred and dimpled the skin, and countersunk the plastic scoop. Since I'll be installing the scoop with rivets, I needed a backing blate for the flange of the scoop, so I fabricated one out of scrap 0.20 aluminum. I match-drilled the ring and primed and painted it.

With help from a friend, I also mounted fuselage on the rotisserie, then spent some time cleaning and prepping the interior of the fuselage for priming and painting.
' style=

NACA scoop drilled to the fuselage skin.

NACA scoop drilled to the fuselage skin.

' style=

Cutting out the backing ring.

Cutting out the backing ring.

' style=

The backing ring, fitted to the plastic scoop.

The backing ring, fitted to the plastic scoop.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.