KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  1-10-2015
Number of Hours:  3.50
Manual Reference:  
Brief Description:  L and R flap fairings

Tonight, my friend Bill came over and helped me drill the first 14 attachment holes for the flap fairings. These are the ones that are back-drilled from the inside of the fuselage. Once this was done, I spent the next few hours fitting, bending, trimming and drilling the fairings, getting them both attached with clecoes. I think I got a pretty good fit on both sides. The lower inboard flap skins still might have to be trimmed and bent a bit -- we'll see.
' style=

L flap fairing with the first 7 holes drilled and clecoed.

L flap fairing with the first 7 holes drilled and clecoed.

' style=

R flap fairing. Starting to drill and cleco back and underneath.

R flap fairing. Starting to drill and cleco back and underneath.

' style=

L flap fairing, completely clecoed.

L flap fairing, completely clecoed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.