KitLog pro

Powered By Kitlog Pro v2.0

Bob's Web Site
' style=
Date:  5-2-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Painting Fuselage

Finished prepping the Fuselage for paint, Taped off the bottom of the Fuselage as it was already painted. Painted the sides and top of the Fuselage.

We have left the hangar at 70 degrees nearly the whole winter for the covering of the fabric and painting of the plane. We ran the overhead fans daily and left the various parts in the paint booth with the paint booth fans running. During our most recent painting we have put a fan blowing air out of the hangar. Since the outside air temp has been so warm.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.