Powered By Kitlog Pro v2.0
Bob's Web Site
S-20 Raven
Covering
11-23-2015
< Previous Log Entry
Next Log Entry >
Date:
11-23-2015
Number of Hours:
6.50
Manual Reference:
Brief Description:
Covering Right wing
Fitted top cover for the right wing. Wing frame was already glued and waiting to go. Started hitting the fabric with the iron. Got the top cover on and ready for a last round witht the iron and then 250 on the fabric for tension.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Raven Home
Category
# Logs
# Hours
All
328
1363
Avionics
1
0
Avionics Panel
40
203
Covering
52
264
Empennage
11
28
Engine
15
63
Fuel Trailer
2
8
Fuselage
89
336
Miscellaneous
21
74
Painting
40
160
Prop
2
7
Rans S-20 Kit
4
6
Shop Supplies
1
2
Tools
1
2
Wings
49
210
Copyright © 2001-2024 Matronics. All Rights Reserved.