Powered By Kitlog Pro v2.0
Bob's Web Site
S-20 Raven
All
3-16-2015
< Previous Log Entry
Next Log Entry >
Date:
3-16-2015
Number of Hours:
5.00
Manual Reference:
Text Manual 05A-01
Brief Description:
Fuel Tank Assembly
Assembly - Items #1 thru #6
Filled each tank with water after fittings were installed and let them sit for 48 hours. No leaks.
Complied with all the items as per the Manual.
Installation - Items #7 thru #14 (Including the Fuel Cap Assembly). Completed as per Manual.
Set the Fuel Cap Assembly aside for final installation.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Raven Home
Category
# Logs
# Hours
All
328
1363
Avionics
1
0
Avionics Panel
40
203
Covering
52
264
Empennage
11
28
Engine
15
63
Fuel Trailer
2
8
Fuselage
89
336
Miscellaneous
21
74
Painting
40
160
Prop
2
7
Rans S-20 Kit
4
6
Shop Supplies
1
2
Tools
1
2
Wings
49
210
Copyright © 2001-2024 Matronics. All Rights Reserved.