KitLog pro

Powered By Kitlog Pro v2.0

Bill's RV-14A Project
' style=
Date:  2-23-2014
Number of Hours:  3.00
Manual Reference:  8-4
Brief Description:  Horizontal Stabilizer Rib and Spar Priming

I primed the ribs, spars, doublers, spar caps, and stringers in batches over several days.

Before I could prime the spars, I had to expand my spray booth so that the spars could fit inside. I constructed two additional panels to extend the length of the spray booth by 7 1/2 feet.

All the parts for the horizontal stabilizer (except the skins) have been primed. After the parts dry for a day, they'll be ready to rivet together.
' style=

Ribs Primed

Ribs Primed

' style=

Spars Primed

Spars Primed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.