KitLog pro

Powered By Kitlog Pro v2.0

BRUCE'S WEB SITE
' style=
Date:  6-24-2012
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Engine baffles

Worked on engine baffle for the #3 cylinder. Drilled, deburred, and fit all pieces per baffle plans. Riveted on doublers and stiffener angle. Used goop that came for the heater box to assemble with duct and screen for the opening out of the back side of the baffle and riveted together.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.