KitLog pro

Powered By Kitlog Pro v2.0

BRUCE'S WEB SITE
' style=
Date:  4-10-2009
Number of Hours:  1.50
Manual Reference:  8-15
Brief Description:  Attached F996A and installed platenut to F905

Had new F996A's fabricated by Bakersfield Stainless after they cracked the first pair when bending in the 2.7 degree bend. Located and clamped brackets to fuselage and F905 and backdrilled two holes through fuselage. Temporarily bolted in F996A's after determining location to drill hole through them to the F905 and drilled holes. Installed platenut on F905's.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.