KitLog pro

Powered By Kitlog Pro v2.0

BRUCE'S WEB SITE
' style=
Date:  8-24-2013
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Control cables, USB's for panel

Ran throttle, mixture, carb heat and heater box control cables. Need bracket for cables to be supported at the middle subpanel for strength. Decided not to use eyeballs at pass through the firewall because of difficulty accessing to drill holes at this point. Should have done that prior to hanging the engine. Oh well. Used Van's instructions for use of bushings that will be filled with silicone later. Determined placement of two panel mounted USB sockets to be used for the Skyview updates. Made pattern and marked on panel. Used Dremel tool to cut opening after drilling small holes in the corners for radiuses. Drilled holes for USB's to attach to the panel and mounted using #40 screws and lock nuts. Worked on tidying up the wiring.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.