KitLog pro

Powered By Kitlog Pro v2.0

BRUCE'S WEB SITE
' style=
Date:  6-4-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Pitch Servo, brake pedals

Adjusted rod ends on pitch servo arm to bellcrank assembly. Tightened all nuts and put torque seal on. Drilled hole for cabin heat cable in firewall angle per plans. Worked on brake pedals, Only have brakes on the pilot side. Clearanced holes in brackets so AN3 bolts would pass through. Attached pedals to brackets. Attached brake cylinders to brackets and pedals. Have nice pedals for passenger side and fabricated brackets to attach. Screwed pedals onto brackets. Trying to figure out how to assemble pedals so they are stationary and non-functional. Will use bottoms holes with AN3 bolts as normal. Thinking of using adel clamps at the top of the pedal to go around tubing and bolt through the pedal angle bracket. Should work but I don't have clamps so will have to buy them at the store.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.