Powered By Kitlog Pro v2.0
Brent Connelly - N913BC
RV-12
Production Acceptanc
11-17-2013
< Previous Log Entry
Next Log Entry >
Date:
11-17-2013
Number of Hours:
6.00
Manual Reference:
Brief Description:
Worked on items to get ready for weight and balanc
Fabricated flap retention stop and primed/painted.
Finished installing interior after reinstalling fuel tank.
Riveted remaining covers below the landing gear attach points. Installed access covers on the belly.
Installed the empanage faring and measured various items to within specs for production acceptance.
Added wire to connect Skyview and SL40 radio so that frequency will be displayed on Skyview screen.
Installed upper fuselage skin.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
626
1337
06 - Vert. Stabil
5
17
07 - Rudder
3
8
08 - Anti-Servo Tab
3
6
09 - Stabilator
17
42
10 - Tailcone
24
47
11 - Emp Attachment
10
14
12 - Emp Fairings
8
14
13 - Spar Assembly
3
10
13 Spar Assembly
3
10
14 - Rear spar, tub
9
14
15 - Wing Ribs
22
54
16 - Stall Warning
2
6
17 - Wing Skins
26
76
18 - Flaperon
14
45
20 - Ctr Section Bul
3
10
21 - Mid Fuse Ribs &
24
70
22 - Fwd Lower Fuse
6
16
23 - Side Skins
12
36
24 - Rollover Struct
10
24
25 - Tailcone Attach
12
25
26 - Seat Backs
5
8
27 - Rudder Petals &
5
18
28 - Fuel System
4
12
29 - Fwd Up. Fuselag
20
46
30 - Wing Attachment
5
9
31A - Wing Electrica
4
7
31B - Fuselage Wire
20
32
32 - Flight Controls
21
40
33 - Miscellanea
5
11
34 Canopy Install
44
85
35 Landing Gr. Engin
7
18
36 - Gear/Leg Fairin
20
39
37 - Fuel Tank
16
28
38 - Cowling
16
30
40 - Lighting
11
26
41 - Interior Panel
1
1
42C - Skyview D1000
8
17
42D - Skyview Update
5
5
42F - ACK E-04 ELT
4
10
44A - Autopilot Serv
5
8
45A - FW FWD Wiring
8
19
46 - Engine Installa
20
30
47 - Spinner Propell
13
48
48 - Exhaust System
3
4
49 - Cooling System
20
39
50 - Engine Controls
1
3
51A - Placards
1
2
52 - Towbar
1
1
53 - Skyview ADS-B
9
12
54 - Stiffener Retro
4
8
Avionics
2
3
Empennage
6
8
Engine
3
7
Finishing
3
10
Fuselage
4
14
Hanger
6
12
Int.Options/Paint
4
8
Miscellaneous
21
20
Production Acceptanc
20
46
SB 12-11-09
9
28
SB 13-04-05
2
1
SB 13-08-08
1
0
Tools
11
Wings
5
12
Workshop
7
8
Copyright © 2001-2024 Matronics. All Rights Reserved.