Powered By Kitlog Pro v2.0
Bruce's airplane project
RV-7A
Empennage
10-30-2005
< Previous Log Entry
Next Log Entry >
Date:
10-30-2005
Number of Hours:
1.50
Manual Reference:
Brief Description:
HSTAB HS-702 front spar modification
HS-702 was designed for the RV-8 and so has to be modified with a flange cutback and then bent to 6 degrees.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
226
549
Empennage
79
140
Fuselage
76
253
Shop Supplies
8
12
Wings
63
144
Copyright © 2001-2024 Matronics. All Rights Reserved.