KitLog pro

Powered By Kitlog Pro v2.0

Bruce's airplane project
' style=
Date:  2-19-2006
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Aileron control rod fabrication

Building these was harder than expected. The -12 length rivets required the c-frame to set. One of the shop heads ended up looking poor, but don't want to drill it out and risk damaging the tube. I'll have the end tack welded in addition, so there'll be no doubt about its integrity since these structures are pretty important.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.