KitLog pro

Powered By Kitlog Pro v2.0

BILL'S WEB SITE
' style=
Date:  10-28-2017
Number of Hours:  1.50
Manual Reference:  
Brief Description:  AFT Landing Gear Bracket BID Ply Stack

I decided to layup the aft pad in a conventional way one ply at a time. Results look good. The pen marks are very handy in keeping the ply stack in position and working the ply drop off. I then peel plied the result. I will compare this result with the ones I "pre-pregged" on the bench. Time includes cutting the plys.
' style=

15 ply Stack With Peel Ply

15 ply Stack With Peel Ply

' style=

Both Pads in Place RH Fuselage Side

Both Pads in Place RH Fuselage Side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.