Applied the nine ply reinforcements to the RH side of the F22 bulkhead. I used the prepreg between plastic method. I did this as two ply uni, three ply uni, two ply bid, two ply bid. The scissors were just able to get through the three ply stack up. This all worked well. I will do the LH side tomorrow night