KitLog pro

Powered By Kitlog Pro v2.0

BILL'S WEB SITE
' style=
Date:  5-28-2008
Number of Hours:  8.00
Manual Reference:  22.1
Brief Description:  Environmental control system

Environmental Control System

arrive 8:30
Ryan provides overview of tasks
Ryan provides pre-prepped tie anchors
First task - adhere anchors along heating and AC line routes

Cut platic strips to protect hoses at tie wrap points - approx 30 large and small (for larger AC and smaller heat tubing)
Route heater cable on pilot side. Junctionn forward of door, then under floor. Connect left and right side for balance. Route heat hose on co-pilot side, similar junction for cabin heating

Route AC hose on pilot & copilot side. Crosses heat hose on co-pilot side aft of wing.
Run AC hose through bulkhead aft of door. Connect left & right through floor support and into side brackets.
' style=

heating balance tube

heating balance tube

' style=

pilot side heating & AC

pilot side heating & AC

' style=

aft section AC tubing

aft section AC tubing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.