Brief Description: Riveted skeleton and started skining
Riveted together the stab skeleton. Due to enlarged holes A5 rivets were used for the central ribs to the front spar. Per a phone conversation with Zenith, the three rivets that hold the front spar to the middle left rib were switched to A5 as well since the holes measured within the rip range of the A5 rivet.
Started the skinning process of the bottom of the Stab. and elevator. Rivet pattern lined up with the crimps in the ribs on the elevator so it was shifted back 10mm.