Chad's Challenger II Site
Challenger II Long Wing
Empennage
4-24-2005
< Previous Log Entry
Next Log Entry >
Date:
4-24-2005
Number of Hours:
6.00
Manual Reference:
Brief Description:
Empennage rigging completion
Completed rigging the empannage.
Temp. riveted roney brackets to the underside of the horizontal stabilizers.
Installed elevators and elevator control horns, assembled left and right elevator control rods, adjusted and riveted.
Adjusted rudder pedals such that the pedal stop dosen't allow the rudder to dontact the elevator horns.
Disassembled the empannage so all tail surfaces are ready for cover.
Empannage
View 2
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Challenger II Long Wing Home
Category
# Logs
# Hours
All
193
693
Avionics
9
19
Controls
4
15
Covering
31
133
Electrical
13
50
Empennage
7
20
Engine
15
43
Fuselage
42
155
Instruments
2
15
Miscellaneous
15
49
None
7
6
Paint
22
96
Wings
26
92
Copyright © 2001-2024 Matronics. All Rights Reserved.