KitLog pro

Powered By Kitlog Pro v2.0

ARTHUR'S WEB SITE
' style=
Date:  4-29-2013
Number of Hours:  4.00
Manual Reference:  Section 31
Brief Description:  Service Bulletin 12-11-09

SB12-11-09

Step 48: Removed supports under the fuselage.

Step 49: Reinstalled the two most outboard cushion clamps on Center Section Assy. per Construction Manual Page 31-03.

Step 50: Reconnected the Caliper Brake Lines to their fittings on the Inboard Main Gear Attach Brackets.

Step 51: N/A. No brake fluid yet.

Step 52: Reinstall Fuel Tank connected fuel lines to the tank. Bolted tank to the Baggage Bulkhead and using new frangible bolts to the Center Section.

Step 53: N/A. No ELT installed yet.

Step 54: N/A. No battery installed yet.

Step 55: N/A. Not adding fuel yet.

Step 56: Installed five inspection covers on the belly.

Steps 57 thru 63 Not installed at this time.
' style=

Reinstall Cuchion Clamps

Reinstall Cuchion Clamps

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.