Marked lower wing screw attach points and cut and tapered four 7/16 bolts. Moved aircraft to allow installing wings in our shop. Cleaned up shop floor. Installed both wings with the help of Gus and Carl from Van's Aircraft. Setup plumb bobs on wing leading edge to check wing sweep. Measured with laser light line and checked triangle measurements to tail. Then setup jig to check wing incidence and adjust both wings for equal incidence. Clamped rear spar, measured for bolt hole, rechecked incidence then drilled the rear spar mount undersize. Installed flap bushings and temporarily fitted both flaps to check for clearance issues. Fabricated forward attach brackets and bent to fit. Drilled out mounting holes and mounted brackets to fuselage. Drilled out matching holes between forward attach brackets and fuel tank brackets. Had a beer!