KitLog pro

Powered By Kitlog Pro v2.0

N905AD Web site
' style=
Date:  7-12-2006
Number of Hours:  10.00
Manual Reference:  7-
Brief Description:  More Wing Work

Completed riveting of aileron and flap fairings. Cut strobe cables and ran left wing wiring through wings making sure it was clamped out of the way of the aileron bellcrank assembly. Wiring grommets for right wing were too small for the wiring bundle with the landing light wiring, so removed the original grommets and upsized all holes for half inch grommets. Installed grommets then ran the wiring bundle for the right wing. Installed terminal strips outboard in each wing for connections to lights. Removed the right wing fuel tank end cover and setup for installation of the fuel pickup. Also bent and cut the fuel tank sending unit float and installed into the sending unit. Measured the resistance values at low fuel and full tank to validate the sending unit and verified proper fit for both low fuel and full tank. Installed fuel tank pickup tubes for both fuel tanks using pro-seal on nuts and safety wiring them to insure they don't work loose. Installed both fuel tank end covers using pro-seal as gaskets and pro-sealing each nut. Installed both fuel drain valves.Received upholstery and temporarily put in place to see how it looks. Looks great!
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.