Drilled out holes for screws in upper part of bulkhead F-705 and attached screws, nuts. Drilled out for static port line and put static line thru fuselage up to forward cabin.Removed instrument panel and riveted map box to panel. Ready for powder coat.Final installed rollbar after powder coating. Painted rear baggage compartment area.Removed baggage compartment panels for powder coating.Riveted canopy rail sides to canopy frame and pop riveted canopy frame supports.Soldered leads to autopilot connector and assembled remote actuator connector.Torqued main gear leg bolts and tightened rudder pedal holddown bolts.Connected manual aileron trim springs and adjusted for equal tension.