Painted interior components and side rails. Sidewalls will be left with the 'brushed look' primer done for the Quickbuild kits.Started work on the landing gear. Broke apart main wheels and checked bearings for grease (OK). Talcum powdered tire interiors and installed tubes. Rebolted main wheels and torqued. Inflated and deflated tubes several times to insure seated properly.Took apart calipers for installation. Buffed brake mounting flanges to fit brake mounting plates. Installed left brake mounting flange with allen screw. Made 3 spacers for mounting plate. Mounted tire assembly and installed the wheel nut and marked for cotter pin. Removed tire and drilled hole for cotter pin. Ready for final assembly of left wheel.