KitLog pro

Powered By Kitlog Pro v2.0

N905AD Web site
' style=
Date:  6-22-2006
Number of Hours:  12.00
Manual Reference:  
Brief Description:  ELT and wiring

Mounted engine to firewall gound cable to firewall. Installed floor mats onto cabin floor to check appearance. Fabricated and installed fuel line from fuel pump to gascolator. All inside fuel lines now run.Fabricated ELT mounting hardware and mounted ELT to support bracket. Cut hole in tail for ELT antenna. Now ready to mount ELT support bracket, antenna, and route ELT antenna cable.Connected wiring to strobe terminal strip and provided strain relief for cables. Also connected flap motor wiring and fuel pump wiring. Cut hole in panel for starter switch and mounted starter switch. Temporarily mounted switches and circuit breakers to test wire routing and complete ground connections.
' style=

Strobe Power

Strobe Power

' style=

Panel

Panel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.