KitLog pro

Powered By Kitlog Pro v2.0

N905AD Web site
' style=
Date:  3-17-2006
Number of Hours:  8.00
Manual Reference:  N/A
Brief Description:  Internal Aft Fuselage

Cut grommet holes for tail light wirings. Stabalized wiring with tie wraps and tie wrap stick ons. Cut holes for wiring to route through rear bulkheads for connection to the tail. Cut holes for static ports on both sides of aircraft and installed both ports. Setup 'T' connection for static port lines to go to both static ports. Installed and connected lines to both static ports and feed main static port through side grommets forward. Still need to complete passage to instrument panel. Connected sholder harness wires ready for sholder harness. Aft fuselage completed for now. Sanded and fit tail fairing for a good fit. Drilled attach holes in fairing and mounted plate nuts for screw attach of tail fairing. Clecoed in forward deck top skin and began match drilling of skin. Still need to final fit sides before can complete match drilling.
' style=

Aft Interior

Aft Interior

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.