Threaded rudder cables through fuselage on both sides. Installed contol column linkages and insured control system operated freely and with no 'slop' in the controls. This required extra washers as spaces to get proper action on the control system. Adjusted and nstalled stick to bell crank push pull tube and adjusted bolts on bell crank and rear push pull tube. Linkage now ready for empennage install.