KitLog pro

Powered By Kitlog Pro v2.0

Building an RV8
' style=
Date:  8-16-2006
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Seal Left Fuel Tank (Continued)

Photo #1 shows the results after backriveting and then using a popsicle stick to spread the sealer around the edges and over the shop heads. Photo #2 shows what the skin looks like after the riveting process and before cleaning. Photo #3 shows the finished exterior result. Had a little sealer left over so went ahead and sealed the drain flange to the tank as well - see next entry.
' style=

Riveted in place and sealing spread over the shop heads

Riveted in place and sealing spread over the shop heads

' style=

It is a mess - after riveting

It is a mess - after riveting

' style=

Looks good after cleaning it up

Looks good after cleaning it up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.