KitLog pro

Powered By Kitlog Pro v2.0

Richard's Web Site
' style=
Date:  10-23-2015
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Add trailing edge to R elevator.

Cleco trailing edge of right elevator to the elevator. No pictures yet I will mask the trailing edge whcih has already been primed and is ready for paint and then prime the fabric.When fabric is primed I will uncover the trailing edge and paint it and the elevator together. Primer is PPG Delta DPU217

Complete drilling of hinges on L elevator trim tab which has already been painted.

I will wait until both ailerons are painted and attached to the horizontal stabilizer before attaching the fiberglass tips to both. These have to be cut to allow movement of the trim tab and to properly place the tip onto the R elevator. This cutting is best done when the elevators are attached to the horizontal.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.