KitLog pro

Powered By Kitlog Pro v2.0

Richard's Web Site
' style=
Date:  7-27-2015
Number of Hours:  3.00
Manual Reference:  8-6
Brief Description:  Transfer drill the prejigged VS assembly

Marked all VS holes left and right to be drilled. Step drill and cleco. There are a lot of holes and the manual calles for step drilling each using 40 the 29 and many to 19. Drilling along the front and rear spar lines through the spar flange doublers requires very sharp drill bits.
' style=

marked all hole sizes

marked all hole sizes

' style=

Step drilled and cleco right side

Step drilled and cleco right side

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.