Brief Description: Continue step drilling both sides of the L HS
After sing step drill 40 x 29 and clecoed with #4 I turned the HS so that its rear spar was on the table and checked the alignment of the leading edge using a string and level. Will insert picture. Leading edge in alignment so turned the HS over onto its bottom side and step drilled 40 x 29 all holes and clecoed every other hole.