KitLog pro

Powered By Kitlog Pro v2.0

RV-8 Build Log
' style=
Date:  4-4-2022
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Elevator Fold and Skeleton Prep

Quick evening tonight, worked on folding the skins with the skin folding jig that I made earlier,. Both the left and right came out well. Also started the prep work on the elevator skeleton for the right hand side, cleco’d the skin in place and ready to start match drilling the skin to the right skeleton, also did the lead weights as per the steps in the instructions. Next I need to work on the left hand side of the skeleton, and match drill both skins. All going well.
' style=

Left Skeleton underway

Left Skeleton underway

' style=

Right Elevator together, ready for match drill

Right Elevator together, ready for match drill

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.