Powered By Kitlog Pro v2.0
RV-8 Build Log
RV-8
All
4-3-2022
< Previous Log Entry
Next Log Entry >
Date:
4-3-2022
Number of Hours:
1.50
Manual Reference:
Brief Description:
Elevator Skelton Work
Work continued on elevator skeleton, A number of ribs and chanels were debured and edge prepared, cleco'd in posistion. Ready to commence the match drilling. Next event will be to fold the elevator skins
Elevator Skeltons
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
103
217
Empennage
84
190
Finish/Paint
1
0
Practice Project
13
23
Research
3
2
Tools
1
2
Wings
1
Copyright © 2001-2024 Matronics. All Rights Reserved.