-Installed static tubing and connectors -Installed snap bushings for static line in all the bulkheads and ran the line forward. Eventually the other end will go behind the panel and go into the backup EFIS (Tru Track Gemini).
Static tubing from port to port, then forward. Spur line will go to ADAHRS mounted on the angles.
Tubing going fwd. The sagging portion will be secured with clips when I rivet on the aft top skin.