Powered By Kitlog Pro v2.0
Todd's Web site
RV-8
Wings
2-28-2009
< Previous Log Entry
Next Log Entry >
Date:
2-28-2009
Number of Hours:
3.00
Manual Reference:
Brief Description:
Rt Wing #15 - Install Leading Edge Assy
Primed (self-etching spray can type) the inside of the outboard top skn on the rivet lines.
Deburred, dimpled, and primed the wing walk doubler plate.
John Furge came over and helped me rivet the leading edge assy to the spar. He shot while bucked the rivets for the leading edge ribs to spar rivets.
While I temporarily installed the fuel tank to the spar, John riveted the leading edge assy skin to the spar with the squeezer.
Cleko'd on the the inboard top skin and wing walk doubler.
Bottom of Rt Wing, Leading edge and tank installed
Bottom looking at tank/leading edge seam
Inboard top skin cleko'd on
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
470
1131
Ailerons
8
28
Building Tips
2
4
Canopy
5
10
Elevators
20
47
Empennage
5
9
Firewall Forward
1
4
Flaps
23
44
Fuselage
226
531
Miscellaneous
2
0
None
1
3
Rudder
11
23
Shop Setup
2
12
Stabs
17
39
Tools
5
9
Tribute to Jake
1
Wings
140
364
Wiring
1
4
Copyright © 2001-2024 Matronics. All Rights Reserved.